top of page
SHIP (B)LOG
Search
Sep 273 min read
Inside Traditional Ship Caulking Tools and Techniques
Last month we described the function and importance of caulking for the health of the ship. Now let’s discuss the materials and tools...
0 comments
Aug 142 min read
Securing the Hull: The Critical Role of Caulking in Wooden Ship Integrity
The hull and deck of a wooden ship is made up of individual planks fitted (ideally) close to each other. Without something closing up the...
0 comments
Feb 17, 20201 min read
Winter Work Updates, Feb. 17th
Our first potluck of the year was a success! If you missed out this time, don’t worry – potlucks will be held monthly through the...
0 comments
Apr 21, 20181 min read
Help Gazela Lead the Parade
In May 2018, the Penn’s Landing waterfront will be abuzz with Sail Philadelphia Tall Ships festivities. As Philadelphia’s resident tall...
0 comments
May 1, 20171 min read
Spring maintenance work continues; the winter cover is almost down!
A great turnout from our volunteer crew over the past two weeks saw a lot of small jobs get done, including general clean-up of areas...
0 comments
May 20, 20161 min read
Getting Gazela ready to sail
A huge thank you goes out to everyone who pitched in to assemble the rig and make crane day on May 15 at the Navy Yard a success. By the...
0 comments
Oct 19, 20151 min read
The vessels are back in the water!
Gazela and Poplar went back in the water on October 8 after two months in dry dock at the Philadelphia Navy Yard. Gazela is currently at...
0 comments
Aug 31, 20151 min read
Pop Up at the Dry Dock on September 10th – tickets on sale!
Please join us on September 10 at 5 p.m. at Dry Dock No. 2, operated by Rhoads Industries at the Philadelphia Navy Yard, to celebrate the...
0 comments
Aug 16, 20153 min read
Dry dock project update – August 16
Gazela enters the dry dock On Wednesday, 29 July, Gazela entered Dry Dock No. 2 at Rhoads Industries in the Philadelphia Navy Yard. She...
0 comments
Jul 16, 20152 min read
Dry dock update
Dry docking update – we had a great turnout of volunteers on Saturday, July 11, to learn more about an important project to assess the...
0 comments
Jul 15, 20152 min read
Guild President’s Newsletter – July 2015
Letter from Guild President, Al Ponessa to the Guild July 10, 2015 Dry-docking I have been holding off on this Newsletter so I could...
0 comments
Jul 27, 20141 min read
Another dory shout-out
This time in Tony Souza’s own words on Old Salt Blog: To enhance Gazela’s role as a 113 year old living museum teaching ecology and the...
0 comments
Jun 30, 20141 min read
Dory 29 shout-out
Gina Pickton’s photo of Gazela’s racing dory crews made the internet pages of Duckworks Magazine. The July Splash section of the mag...
0 comments
Apr 25, 20142 min read
Dry docking plan gaining momentum
Here’s the latest info from Eric to our newsletter subscribers about the upcoming dry docking: Preparations are underway! The Marine...
0 comments
Apr 16, 20142 min read
Dry docking Gazela and Poplar
Guild President Eric Lorgus announced long-awaited plans to get Gazela into dry dock for inspection and repairs: I have great news. We...
0 comments
Aug 30, 20131 min read
Dory Update
The frames, transom, transverse cleats and stem are epoxied to the bottom and the skeleton is ready for the hull planking. The long dark...
0 comments
Jul 12, 20131 min read
KYW Talks About Upcoming Repairs
Here’s a short overview of plans for short-term and long-term Gazela repairs. From KYW: Philadelphia’s tall ship, Gazela, will be sailing...
0 comments
bottom of page